Most roofing bids get the squares close and lose money on the metal. A takeoff that reports 42 SQ of field and one line for "flashing, allow" leaves the estimator guessing at hundreds of linear feet of drip edge, step flashing, counterflashing and coping that each price differently.

Flashing and edge metal are measured in linear feet, priced by the piece or the bundle, and installed at very different labor rates. This checklist covers what to measure, how to break it out, and where the LF usually goes missing on steep-slope and low-slope jobs.

Why flashing deserves its own takeoff lines

Field material scales with area. Flashing scales with edges, walls and interruptions. Two roofs with the same 30 SQ can carry very different metal scopes. A simple gable ranch might have 220 LF of eave and rake. A cut-up two-story with dormers, a chimney and three sidewalls can carry twice that in perimeter plus another 150 LF of step and counterflashing.

When all of that is folded into one allowance, three things go wrong:

  • The material order is short or long, because nobody knows how many 10-foot sticks of each profile are needed.
  • Labor is underpriced, because step flashing at a sidewall takes far longer per LF than drip edge on a straight eave.
  • The proposal cannot explain the number when a customer or GC asks why the metal line is high.

Separate lines by condition fix all three. The estimator can apply the right unit price, the office can order by profile, and the crew lead can see the scope before loading the truck.

Steep-slope edge metal checklist

On shingle, tile and metal roofs, start at the perimeter and work inward. Measure each item in LF and keep them on separate lines.

Eaves and rakes

  • Eave drip edge. All horizontal roof edges where water leaves the roof. Include porch roofs, bay roofs and low eaves that sit under a second-story wall.
  • Rake drip edge. All sloped gable edges. Rakes are measured along the slope, not the plan view, so pitch matters. A 20-foot horizontal run on a 10/12 rake is about 26 LF of metal.
  • Starter strip. Usually eave LF, plus rake LF if the manufacturer or the contract calls for starter on the rakes.
  • Gutter apron or extended drip edge. If the scope uses a different profile at the gutter line, give it its own line instead of counting it as standard drip edge.

Valleys

  • Open metal valleys. Measured along the valley line. Note the metal width and gauge if the plans or spec call it out.
  • Closed or woven valleys. Still worth an LF line, because the ice and water underlayment in the valley is driven by the same number.

Valleys on a plan view are always shorter than the real line on the roof. If the takeoff reads valleys off a flat drawing without adjusting for the pitch of both intersecting planes, the LF comes up short.

Walls and chimneys

  • Step flashing. Where a sloped roof runs up beside a wall. Measure the LF along the slope. Pieces are typically ordered by the bundle, so the LF has to be converted using the shingle exposure.
  • Headwall or apron flashing. Where the top or bottom of a roof plane meets a wall horizontally.
  • Counterflashing. Over step and headwall flashing on masonry walls and chimneys. On siding walls this may be the siding itself, so check the scope before adding a line.
  • Chimney flashing. List each chimney with its width and whether it needs a cricket. A chimney 30 inches or wider on the upslope side usually needs one, and that is a separate fabricated piece.
  • Kickout flashing. Count each one as an each. They are cheap to buy and expensive to leave out when water ends up behind the siding.

Ridges, hips and transitions

  • Ridge and hip LF. Mostly a cap and ventilation number, but on metal roofs it is trim.
  • Pitch transitions. Where a 4/12 porch meets an 8/12 main roof, or a low-slope section ties into shingles, the transition metal and the extra membrane or underlayment belong on their own line.

Low-slope perimeter and flashing checklist

On TPO, PVC, EPDM and mod-bit jobs, the metal scope is usually bigger and more expensive per LF. The same rule applies: one line per condition.

Roof edges

  • Gravel stop or drip edge. Perimeter LF where the membrane terminates at an open edge.
  • Fascia or two-piece edge systems. Some specs call for a tested edge system at the perimeter. That is a different product and price than a bent drip edge, even on the same LF.
  • Gutter and downspout tie-ins. Note where the edge sits over a gutter so the profile is right.

Parapets

  • Coping. LF of parapet cap. Note the wall width, because coping is ordered by width as well as length.
  • Base flashing. LF along the base of the parapet, with the flashing height. A 12-inch base flashing and a 36-inch wall wrap share a name and nothing else.
  • Termination bar or counterflashing. LF at the top of the base flashing where it is not wrapped under the coping.
  • Corners. Count inside and outside corners. Coping corners and membrane corners are each items, and a parapet with many jogs adds up fast.

Walls, curbs and joints

  • Wall flashing at higher walls. Where the low roof meets a taller part of the building. Record LF and height.
  • Curb flashing. LF around each curb with its height. Curbs are often counted as penetrations and the flashing LF never makes it into the metal total.
  • Expansion joints. LF by type, since a cover strip and a full joint assembly are priced very differently.
  • Scuppers and through-wall drains. Each item, with the size if shown.

Penetrations like pipes, vents and pitch pans deserve their own count. We covered that in detail in how to take off roofing penetrations.

Turning LF into an order

A clean LF total is only half the job. Before it can be priced or ordered, convert it to pieces.

  • Sticks. Most edge metal comes in 10-foot lengths. Laps of 2 to 4 inches mean each stick covers a bit less than 10 feet. Divide LF by the net coverage per stick and round up.
  • Bundles and boxes. Step flashing and some accessories are sold by the bundle or box. Convert LF to pieces using the exposure, then to bundles, and round up to whole units.
  • Corners and end caps. Add these as each counts. Do not assume the stick count covers them.
  • Waste. Metal waste comes from short runs, cuts at corners and damaged pieces. A long straight eave wastes very little. A roof with many short rakes and dormers wastes more. Apply waste by condition, not as one flat percentage. Our post on roofing takeoff waste factors walks through how to set them.

Keep the LF and the converted counts on the report side by side. If the supplier changes stick length or the crew wants a different profile, the LF is still the source of truth.

Where flashing LF usually goes missing

These are the misses that show up again and again when a bid is reviewed after the job is built:

  • Measuring rakes and valleys in plan view. On steeper roofs the difference between plan and true length is large enough to short an entire order.
  • Skipping lower roofs. Porch, garage and bay roofs often sit on a separate sheet or get treated as a footnote. Their eaves, rakes and sidewalls are real LF.
  • Treating every wall the same. A siding wall, a brick wall and a stucco wall each flash differently. The takeoff should note the wall type next to the LF.
  • Ignoring detail sheets. The roof plan shows the edge. The detail shows whether it is a drip edge, a two-piece fascia or a coping with a cleat. Pricing depends on the detail.
  • Losing curb and chimney perimeter. Counting a curb or chimney as one each and never adding the LF of flashing around it.
  • Folding metal into labor. If flashing is buried inside a labor rate, nobody can check it, and every job prices it a little differently.

What a usable flashing section should look like

When the takeoff comes back, the flashing and metal section should be easy to read without opening the plans. A good one has:

  • One line per condition: eave, rake, valley, step, headwall, counterflashing, coping, base flashing, edge system, and so on.
  • LF for each, measured along the true slope where it applies.
  • Heights for wall and parapet flashing, and widths for coping.
  • Each counts for corners, crickets, kickouts and scuppers.
  • Notes where the plans conflict or do not specify a profile, so the estimator can carry an assumption in the bid instead of guessing silently.

Every number in a takeoff still needs a final check against the plans, the spec and the site. Our estimating disclaimer explains how quantities should be reviewed before they go into a price.

Get the metal right before bid day

Flashing and edge metal are small line items that add up to a big part of the margin on a roofing job. Measuring them by condition, in true LF, and converting them to real order counts is the difference between a metal line you can defend and one you hope works out.

If you would rather have that work done for you, the SureSquare takeoff service measures steep-slope and low-slope roofs by hand from your plan set, and the report downloads as a PDF and CSV. Pricing is per project with no contract. See the service levels on the pricing page, or send questions to sales@suresquare.bid.

Need a roofing takeoff?